Construction progress Monday

We had 2 workers today. They were the b team for sure and didn’t know how to let Darvin and I help too much. But they made progress. The roof got up, so we got to take down most of the old house that was left inside.

20170130_101518

 Donated drain pipe from friends in town. Darvin met me with the horse cart and we followed it up the hill on our bikes.

20170130_133506

The zinc/tin roof panels feel like plastic, but are very strong. 2×4 rafters are 3 feet apart and this guy was walking all over up there.

20170130_133456
20170130_152036

The back door framed.

20170130_133658

The old front door remnants in front of the new house.

20170130_110425
20170130_152026

This 50+ year old, 250lbs dude was as slow as mollases all day. He was saving up for this. I left at 3:45 after he,was in there 30 minutes and had already gone another 2 feet deep.

20170130_152018

The finished roof and partially cleared out old house. Plastic upper wall will hopefully get replaced with wood tomorrow. 

20170130_15201820170130_12004320170130_15204520170130_152048